Power supply certification: what we will and will not supply
Power supply certification stated plainly: what a UL listed power supply or a UL 508 power supply certificate covers per model, what the sourcing disclaimer excludes — IP65 power supply claims included — and the five-step RMA process if a unit fails on site.
Power supply certification: the certificates
Certificates are held per model and per order, by the manufacturer — not globally by us. The common set is below. If a certificate is a condition of your tender, request the specific file and check the model number on it against the model number you are buying.
| Standard | Typical scope | Notes |
|---|---|---|
| CE | Most units in the range | Declaration of conformity issued by the manufacturer |
| RoHS | All units | Material declaration available on request |
| IEC 61000 (4-series) | EMC immunity and emissions | Test report per model; levels vary by product family |
| EN 50155 / EN 50121 | Railway onboard and trackside | Only the railway product family; temperature and input class stated explicitly |
| IEC 62477-1 / IEC 62368-1 | Power conversion safety | Cabinet and larger system builds |
Sourcing disclaimer
We are not an authorized distributor of any brand. Units are sourced project-by-project from North China manufacturers under documented specifications. Brand names, if any appear on this site, are used only to describe compatibility or a manufacturing origin. Nothing on this site should be read as an agency, franchise or exclusive representation claim.
Scope of supply
- Civil infrastructure only. Mining, power transmission and distribution, rail, telecom, water and wastewater, industrial process.
- No military, no defence, no dual-use procurement. We decline these inquiries, including those routed through a civilian intermediary.
- No end-use guarantees we cannot verify. Where an end user is not disclosed, we ask for a written end-use statement before production.
RMA process
Returns are handled in five steps. Keep the original packing; a unit returned in a different enclosure cannot be assessed against the test record.
- 1. Report — send the model, order number, serial number, a photo of the nameplate and a description of the failure, with the site conditions at the time.
- 2. Triage — we respond within 2 business days with either a field check (connections, configuration, load) or an RMA number.
- 3. Return — ship to the address on the RMA, freight prepaid unless the failure is accepted as a manufacturing defect.
- 4. Assessment — the factory opens the unit and issues a failure analysis; module-level repair or replacement is the normal outcome.
- 5. Close-out — report, corrective action and, where the batch is affected, an advisory note to other buyers of that batch.
Out-of-warranty repair is quoted before work starts. Consumables (fans, filter media, batteries) are excluded from warranty but are field-replaceable by design.
Europe — documentation & representation
For a European order the document set is prepared per model and per order. Civil infrastructure only; we do not relabel units to make a tender fit. Where a project needs local representation, we work through the client's own agent.
| Item | Scope | Status |
|---|---|---|
| CE | Declaration of conformity with the applicable directives named in the file | Documentation prepared per model and per order |
| RoHS | Material declaration | Documentation prepared per model and per order |
| REACH | SVHC statement | Documentation prepared per model and per order |
| WEEE | Registration and labelling information for the importer of record | Documentation prepared per order |
| IEC 62040 | UPS performance and safety test record | Documentation prepared per model and per order |
| EN 50155 / EN 50121 | Railway onboard and trackside EMC | Documentation prepared per model and per order; revision NEEDS_HUMAN_CHECK |
| EN 45545 | Railway fire-behaviour material documentation | Documentation prepared per model and per order |
| IEC 61000 | EMC immunity and emissions test report | Documentation prepared per model and per order |
| EORI | Importer-of-record details supplied for the specific order | Documentation prepared per order |
| VAT | Invoice and tax handling for the specific order | Documentation prepared per order |
| Impressum | Imprint details for the specific order, where required | Documentation prepared per order |
| GDPR | Enquiry-data handling as set out in the privacy notice | Documentation prepared per order |
These documents are not held as a standing file across the product line; the client's own agent or the named importer of record handles local representation. Certificates are issued per model and per order. We do not claim blanket certification across the product line.
Where the certificates come from
We do not issue certificates. The manufacturer does, per model and per order, and the file cites a standard and a revision. The links below go to the bodies that publish those standards so you can check the revision your tender names against the revision on the certificate you receive.
Links go to the publishing body. Revisions and national implementations differ — check the revision cited in your tender against the one on the certificate.