DC Power System and Industrial Power Supply Selector
Work down the two steps and leave with the right dc power system or family — industrial UPS, wide-temperature DC/DC, 220 V DC panel, EN 50155 railway power, DIN-rail PSU, a DC DC converter module or a custom power supply — then a configured quote, usually within one business day.
Step 1 & 2 — choose your dc power system by duty, then environment
Pick the duty that matches your site, then the environment it sits in. Selecting nothing commits you to nothing — it only tells us what to quote.
Load / duty
What are you powering? This decides the product family and the certificate set.
Ask for The load list with start-up surges, not just steady-state kVA.
Site environment
The environment decides the component grade and the enclosure — more often than the nameplate does.
Ask for Summer maximum, winter minimum, altitude and how the cabinet is ventilated.
Build the bill of materials — UPS detail
If your duty is a rugged industrial UPS, work the five stages below. This is the same configurator as the Rugged UPS page, carried over so you can pick a tier and send it straight to us.
A UPS is a bill of materials, not a part number. Work down the stages, pick the tier you want us to source against, then send one stage or the whole package. Selecting nothing commits you to nothing.
UPS host unit
Double-conversion online, 10–200 kVA. Four parameters settle the host unit: the rating, the input and output configuration, the form factor, and whether a brand is named in the tender at all.
Ask for The load list with start-up surges, the supply available on site, and the space you have for the cabinet.
Rating
Input and output
Form factor
Brand preference (optional)
Battery pack / battery bank
The part that fails on a cold or hot site. Capacity is set by the duty cycle, not a nominal hour figure.
Ask for Required autonomy and discharge events per year.
ATS / transfer switch
Moves the load between mains, generator and inverter. The transfer time is the spec that matters.
Ask for The maximum transfer time your load can survive.
Diesel generator set
Where there is no grid, or where autonomy exceeds what a battery bank can carry.
Ask for Fuel, altitude, and whether prime or standby rated.
Enclosure, thermal and monitoring
Usually the stage that decides whether the rest survives the site.
Ask for Summer max, winter min, altitude and ventilation.
Parameter quick reference
The same families, side by side. Pick the row that matches your duty and environment, then open the page or send the spec.
| Family | Input | Output | Power | Temperature | Standard |
|---|---|---|---|---|---|
| Rugged UPS | 380/400/415 V 3P4W; 220/230/240 V 1-ph on the smaller frames | 380/400/415 V | 10–200 kVA | −40 to +55 °C | CE, ISO 9001 |
| Wide-temp DC/DC | 9–36 / 18–75 / 40–160 V | 12/24/48/110 V (isolated) | 50–1500 W | −40 to +85 °C | CE, EN 50155 opt. |
| 220 V DC panel | AC 3P + battery | 220 V DC | 20–300 A | −25 to +55 °C | CE, IEC 61000-4 |
| EN 50155 power | 24/48/72/110 V DC | 5/12/24/48/110 V | 150–3000 W | −40 to +70 °C (OT4) | EN 50155, EN 50121-3-2 |
| DIN-rail PSU | AC 85–264 V | 24/48 V DC | 60–960 W | −25 to +70 °C | CE, UL on request |
| Custom unit | Per SLD | Per drawing | Per drawing | Per site | Per order |
Get a configured quote
Send your site conditions — altitude, ambient temperature, load profile, required autonomy and any standard your EPC or utility requires — and we return a configured proposal, usually within one business day.